Skip to content

All Products

My Airports

Your shortcuts, saved on this device. Search to add an airport.

No airports saved yet. Add the fields you visit most.

Ask ATIS

Regulation · 14 CFRCurrent as of October 14, 2026 (eCFR)

14 CFR 91.613 Materials for compartment interiors

Subpart G—Additional Equipment and Operating Requirements for Large and Transport Category Aircraft

A reference copy of the official regulation text for study. It is not legal advice or an FAA interpretation; always confirm against the current official source.

(a) No person may operate an airplane that conforms to an amended or supplemental type certificate issued in accordance with SFAR No. 41 for a maximum certificated takeoff weight in excess of 12,500 pounds unless within 1 year after issuance of the initial airworthiness certificate under that SFAR the airplane meets the compartment interior requirements set forth in § 25.853 (a), (b), (b-1), (b-2), and (b-3) of this chapter in effect on September 26, 1978.

(b) Thermal/acoustic insulation materials. For transport category airplanes type certificated after January 1, 1958:

(1) For airplanes manufactured before September 2, 2005, when thermal/acoustic insulation is installed in the fuselage as replacements after September 2, 2005, the insulation must meet the flame propagation requirements of § 25.856 of this chapter, effective September 2, 2003, if it is:

(i) Of a blanket construction or

(ii) Installed around air ducting.

(2) For airplanes manufactured after September 2, 2005, thermal/acoustic insulation materials installed in the fuselage must meet the flame propagation requirements of § 25.856 of this chapter, effective September 2, 2003.

Ask FAR/AIM AISearch the 2026 FAR/AIM with AI. Answers quote and cite the current official text.